YONGHESHENG — Reliable Cable Insulation & Sheathing Compounds

Technical Data

Technical Specifications

Typical physical property data, subject to batch test reports.

No.Test ItemsUnitTypical Value (YHS-B325)
1Appearance-Compliance
2Densityg/cm³1.53
3Tensile StrengthMpa12.5
4Elongation at Break%200
5AgeingTest conditions-135℃*168h
Variation of Tensile strength%+18
Variation of Elongation%-20
6Low-temperature ImpactTest Conditions--40℃
Failure (≤15/30)Piece0
7Oxygen Index%36
8Volume resistivity (20℃)Ω·m2*10¹²
9Dielectric Strength (20℃)MV/m25
10Hot Set TestTest Conditions-200℃ 0.2Mpa 15min
Elongation under Load%35
Permanent deformation after cooling%0
11pH value-5.4
12Conductivityμs/mm1.0
13Smoke DensityWith flameDs max85
Without flameDs max320
RemarkCan be customized according to customer's requirements.
Recommended

Extrusion Process

Mixing: Mix the A and B Component evenly, drop them into the hopper. Please use EVA masterbatch if color required(it should be dry). The material must be use up within 2 hours after unpacking.(It can’t be dried.)Avoid to bring the external water in during the process.

Screw Type: Low smoke halogen free special screw Compression Ratio:1.5±0.2

Double Color Cable(Color line):Use Component A and EVA masterbatch together,without or with a small number of Component B.

Pay-off Speed: Without the effect of smoothness and performance, the faster,the better.

Cross-linking:Natural Cross-link:Temperature 15-25℃,cross-link will finished around 7days.When temperature is higher than 25℃,cross-link will finished around 3days. Water bath or Steam:Control the temperature around 60-70℃,cross-link will finished about 4hours. (the thickness of the test piece is 1mm) Full performance test,water bath (steam) 65℃, more than 8 hours, ensure the material is fully cross-linked.

Extrusion Temperature:Control the melt temperature of Insulation at 160±10℃. The extrusion temperature needs to be adjusted according to the actual situation

MarkZone 1Zone 2Zone 3Zone 4NeckHead
YHS-B325100±10125±10135±10135±10140±10160±10
Processing Guide

Recommended Processing Parameters

1

  • ①Package:Packed by aluminium foil bag.
  • ②Storage:Should be stacked in a clean and dry warehouse.
  • ③Valid Period:12 months.