Typical physical property data, subject to batch test reports.

NO.ItemUnitTypical Value (YHS-1052C)
1Appearance-Compliance
2Densityg/cm³1.46±0.02
3Original Tensile StrengthMPa14
4Original Elongation at Break%260
5Thermal AgingTest Conditions-136℃*168h
Retention Rate of Tensile Strength%+20
Retention Rate of Elongation at Break%-15
6Low-temperature ImpactTest Conditions--40℃
Failure (≤15/30)Piece0
7Oxygen Index%30
8Volume Resistivity (20℃)Ω·m5*10¹²
9Dielectric Strength (20℃)MV/m27
10Thermal ElongationTest Conditions-200℃ 0.2MPa 15min
Elongation Rate Under the Load%35
Permanent Change Rate After Cooling%0
11PH value-5.0
12Conductivityμs/mm1.0
13Smoke DensityWith flameDs max95
Recommended

Extrusion Process

Mixing: Mix the Component A and Component B evenly, add them into the hopper. If the color required, use the EVA base materials (the color masterbatch should be dried). The material should be use up within 2 hours after unpacking.(It can’t be dried.) The external water can’t be brought in during the process.

Threaded Rod Type: Equidistant and unequal depth of single threaded screw Compression Ratio:1.5±0.2

Double Color Cable:he line part is mixed with material A and masterbatch, and it is recommended to add no or less catalyst material B.

Pay-off Speed: Without the effect of smoothness and performance, the faster,the better.

Cross-link: Natural crosslink or Water bath(Steam). Natural Crosslink: Temperature 15-25℃, crosslink will be finished around 7days. When temperature is higher than 25℃, crosslink will be finished around 3 days. Water bath or Steam: Should control the temperature around 60-70℃ in order to keep it from sticking together, it will finish about 4 hours. The thickness of the test piece is ≤1mm. If thickness >1mm, the crosslink time should be adjusted according to actual situation. Full performance test, water bath (steam) 65 ℃, more than 8 hours, to ensure the material is fully crosslinked.

Extrusion Temperature:Control the melt temperature at 160±10℃. The extrusion temperature needs to be adjusted according to the actual situation.

MarkZone 1Zone 2Zone 3Zone 4NeckHead
YHS-1052C100±10125±10135±10135±10140±10140±10
Packaging & Storage

Packaging and storage

1

  • ①Package:Vacuum packed.
  • ②Transport: Can’t be exposed to the sun or rain, or suffer mechanical damage.
  • ③Storage:Should be stacked on the backing plate in a clean and dry warehouse. Valid Period:12 months.