YONGHESHENG — Reliable Cable Insulation & Sheathing Compounds

Technical Data

Technical Specifications

Typical physical property data, subject to batch test reports.

NoTest ItemUnitTypical Value (YT-4501N)
1Appearance-Compliance
2Densityg/cm³1.39
3Shore HardnessA88
4Original Tensile StrengthMPa12
5Original Elongation at Break%350
6AgeingTest Condition-175℃*240h
Variation of Tensile Strength%+15
Variation of Elongation at Break%-10
7With copper ageing 150℃±2℃×3000h-No brittleness
8Low-Temperature ImpactTest Condition--40℃
Failure (≤15/30)Piece0
9Oxygen Index%33
10Volume Resistivity (20℃)Ωm5*10¹²
11Dielectric Strength (20℃)MV/m27
12Hot Set TestTest Condition-200℃ 0.2MPa 15min
Elongation under load%35
Permanent deformation after cooling%0
13Smoke DensityWith FlameDs max310
Without FlameDs max85
14The gas when it burnsHCl and HBr Content%0
HF Content%0
pH Value-5.9
Conductivityμs/mm1.0
⚠️ The smoke toxicity of materials shall be negotiated by the supply and customers according to the needs of product application. Can be customized according to customer's requirements.
Recommended

Extrusion Process

Mixing: Before using this product, mix components A and B evenly and then add them to the hopper. If color is needed, it is recommended to use color masterbatch based on EVA (the masterbatch must be dried). It is advised to use the material within 8 hours after opening the package, and drying the material is prohibited. During the mixing process of components A and B, be careful to prevent external moisture from being introduced.

Screw Type: Optimal compression ratio for the screw: 1.5±0.2

Pay-off Speed: Without the effect of smoothness and performance, the faster,the better

Crosslinking process: After the wire is formed, it can be naturally crosslinked or crosslinked in a water bath (steam). Natural crosslinking: at room temperature of 15-25°C, crosslinking can be completed within a week; at temperatures above 25°C, crosslinking can be completed within three days. If water bath or steam crosslinking is used, to prevent cable adhesion, the water bath (steam) temperature should be controlled at 60°C-70°C and crosslinking can be completed in about 4 hours. The above crosslinking times are based on an insulation thickness of ≤1mm; if the thickness exceeds this, the specific crosslinking time should be adjusted according to the product thickness and degree of crosslinking to meet cable performance specifications. Full performance testing should be conducted, with water bath (steam) at 50°C and boiling time greater than 8 hours, to ensure the material is fully crosslinked.

Extrusion Temperature:It is recommended to control the melt temperature at 160±10°C, and the final extrusion temperature should be adjusted based on the actual situation.

Zone 1Zone 2Zone 3Zone 4NeckHead
100±10125±10135±10135±10140±10150±10
Packaging & Storage

Packaging and storage

1

  • 1.Package:Packed by aluminium foil bag.
  • 2.Transportation: It should not be exposed to sun, rain, or mechanical damage.
  • 3.Storage: Should be stacked in a clean and dry warehouse, Shelf life: 6 months.