Technical Data

Technical Specifications

Typical physical property data, subject to batch test reports.

No.Test ItemsUnitTypical Value: YHS-101W90
1Appearance-Compliance
2Densityg/cm³0.925±0.05
3Melt Index 190°C*2.16kgg/min1.0±0.1
4Tensile StrengthMpa20
5Elongation at Break%500
6Impact brittleness (-76°C)Mpa20
7Air Thermal Ageing - Test conditions-135°C*168h
Air Thermal Ageing - Variation of Tensile strength%+10
Air Thermal Ageing - Variation of Elongation%-10
8Hot Set Test - Test conditions-200°C 0.2Mpa 15min
Hot Set Test - Elongation under Load%50
Hot Set Test - Permanent deformation after cooling%5
9Volume Resistivity (1KV, 20°C)Ω.m28
10Dielectric StrengthMV/m30
Processing Guide

Recommended Processing Parameters

1

Mixing:

  • Mix the A and B Component evenly, drop them into the hopper. Please use PE masterbatch if color required(it should be dried). The material must be use up within 8 hours after unpacking.(It can’t be dried.)Avoid to bring the external water in during the process.
2

Screw Type & Pay-off Speed

  • Screw Type: Single flight PVC screw
  • Pay-off Speed: Without the effect of smoothness and performance, the faster,the better.
3

Extrusion Temperature:

  • YHS-101W90: Zone1 130±10 Zone2 150±10 Zone3 180±10 Zone4 180±10 Neck 180±10 Head 200±10
  • Control the melt temperature of Insulation at 200±10℃.The extrusion temperature needs to be adjusted according to the actual situation.
4

Cross-linking:

  • Natural Cross-link:Temperature ≥35℃,Humidity≥90%,cross-link will finished around 24hours.(Above cross-link time based on the insulation thickness ≤ 1mm) Water bath or Steam:Control the temperature around 90℃,cross-link will finished about 4hours. (Above cross-link time based on the insulation thickness ≤ 1mm)