Data

Application

Trade MarkA:BProduct NameApplication
YHS-EPR6595:5105℃ Silane crosslinked Polyolefin Elastomer Cable MaterialSuit for the insulation of cables up to 3kV
YHS-EPR8095:5105℃ Silane crosslinked Polyolefin Elastomer Cable MaterialSuit for the insulation of cables up to 3kV
YHS-EPR8595:5105℃ Silane crosslinked Polyolefin Cable MaterialSuit for the insulation of cables rated up to 3kV
YHS-EPR9095:5105℃ silane cross-linked polyolefin elastomer cable materialIt is suitable for cable insulation layer of 3KV and below
Technical Data

Technical Specifications

Typical physical property data, subject to batch test reports.

No.Test ItemTest conditionsUnitYHS-EPR65YHS-EPR80YHS-EPR85YHS-EPR90
1Appearance-ComplianceComplianceComplianceCompliance
2Densityg/cm³0.920.920.95-
3Shore HardnessA65808590
4Tensile StrengthMpa13.51818.520
5Elongation at Break%650600600650
6Ageing135℃*168h-
Variation of Tensile strength%+10+10+12+10
Variation of Elongation%-8-8-10-8
7Ageing158℃*168h-
Variation of Tensile strength%+15+15+15+10
Variation of Elongation%-10-10-10-10
8Low-temperature Impact-76℃-
Failure (≤15/30)PiecePassPassPass-
9Volume resistivity (20℃)Ω.m5*10¹⁴2*10¹⁴5*10¹⁴2*10¹⁴
10Dielectric Loss Factor (1KHz, 1V,20℃)-1.5*10⁻³5*10⁻⁴5*10⁻⁴5*10⁻⁴
11Relative Dielectric Strength (1KHz, 1V,20℃)-2.32.32.32.3
12Dielectric Strength (20℃)MV/m30323232
13Thermal Elongation200℃ 0.2Mpa 15min-
Elongation under Load%40404040
Permanent deformation after cooling%0000
14Thermal Elongation250℃ 0.2Mpa 15min-
Elongation under Load%50505050
Permanent deformation after cooling%0000
Processing Guide

Recommended Processing Parameters

1

Drying and dehumidification:

  • Mix the A and B Component evenly, drop them into the hopper. Please use EVA masterbatch if color required(it should be dried). The material must be use up within 2 hours after unpacking.(It can’t be dried.)Avoid to bring the external water in during the process.
  • Screw Type: Suggest to use PVC screw
  • Pay-off Speed: Without the effect of smoothness and performance, the faster,the better.
2

Extrusion Temperature:

  • Mark: Zone1 130±10 Zone2 160±10 Zone3 180±10 Zone4 180±10 Neck 200±10 Head 200±10
  • ontrol the melt temperature of Insulation at 200±10℃ .The extrusion temperature needs to be adjusted according to the actual situation.
3

Cross-linking:

  • Natural Cross-link:Temperature 15-25℃,cross-link will be finished around 7days.When temperature is higher than 25℃,cross-link will be finished around 3days.
  • Water bath or Steam:Control the temperature around 60℃,cross-link will finished about 4 hours. (the thickness of the test piece is 1mm) Full performance test,water bath (steam)60℃, more than 8 hours, ensure the material is fully cross-linked.