📧 Aden@shyhsgroup.com📞 +86-21-61807268
Technical Data

Technical Specifications

Typical physical property data, subject to batch test reports.

Test projectUnitsYHS62018S
Densityg/cm31.05
HardnessShore A80
Original tensile strength (after irradiation)MPa12.0
Original elongation at break%450
Air thermal aging (after irradiation)℃×h136×168
Change rate of tensile strength%+10
Elongation at break rate%-8
Hot elongation test-200℃×15min×0.2MPa
Low temperature℃-40 pass
20℃ volume resistivityΩ·cm6.0×10¹⁵
Dielectric strengthMV/m27
Oxygen Index%30
Content of halogen acid gasmg/g0
pH value-6.0
Conductivityμs/mm0.6
Gasoline (ISO1817,liquid C),23 ± 5℃ 20h-The finished wire diameter change rate is ≤15%; the finished wire has no visible wires and no cracks.
Fuel oil (IRM 903), 23 ± 5℃ 20h-The finished wire diameter change rate is ≤15%; the finished wire has no visible wires and no cracks.
Mineral oil (IRM 902), 50 ± 3℃ 20h-The finished wire diameter change rate is ≤15%; the finished wire has no visible wires and no cracks.
⚠️ Note: The above data is a typical value obtained by testing the product and is not a standard for testing restrictions.
Recommended

Extrusion Process

When the storage environment is wet or the production surface is required to be high, the particles can be dried in a hot air hopper at 70 ℃ for 1-2 hours.

It is recommended to use a low compression ratio screw extrusion with a compression ratio of 1.2-2.0:1.Before extrusion, the screw should be cleaned to ensure the cleanliness of the product. It is recommended to use 80 mesh or 100 mesh filter screen to avoid impurities in the extrusion process, and to ensure the melt pressure to obtain a good appearance and material density.As the difference between the actual temperature of the melt and the indicated value of the temperature control table varies with the type of extruder, the user is requested to select the appropriate temperature according to the specific situation of the extruder used.The following temperatures can be used as reference for start-up and commissioning:

Cylinder ICylinder ⅡCylinder ⅢCylinder ⅣCylinder ⅤHead and mold
120±5160±5165±5170±5175±5180±5
Packaging & Storage

Packaging and storage

1

  • (25 ± 0.2) kg / bag, inner aluminum plastic composite bag, outer kraft paper bag (or customer specified packaging)
  • Stored in dry and ventilated place
  • Prevent sun, rain and water
  • Storage period is 6 months